ESG 2023 - Flipbook - Page 17
Impact on Local Communities
Some additional sample projects where we have had a positive impact on local communities include the following:
Vartry Water Treatment Plant & Reservoir Intake Works:
Commissioning works were completed to the Vartry WTP & Reservoir Intake Works which facilitated the removal of
7 No. water supply zones from the EPA’s Remedial Action List. The Vartry WTP provides a treated water drinking
supply of 80 million litres of water per day to circa 200,000 people in North Wicklow & South Dublin.
TOBIN provided civil & structural design services for the main works Contractor throughout the duration of the project.
National Water Rehabilitation Programme:
At present, it is estimated that Uisce Eireann currently loses circa 38% of all treated water through leaks before it
reaches out taps. Uisce Eireann is on track to reduce this leakage to 25% by 2040. TOBIN are currently providing
design services for Warde & Burke on the National Rehabilitation Programme for the South West Area including
Cork, Kerry, Limerick & Clare. To date, the programme has saved 166 million litres of water daily which equates to
enough water to 昀椀ll 66 Olympic-size swimming pools every day. TOBIN provided design solutions for the replacement
of circa 450km of watermains which it is estimated would result in a saving of over 3.6 million litres of water per day
which equates to enough water to 昀椀ll 1.5 Olympic-size swimming pools every day.
Active Travel Schemes
•
•
•
•
•
•
•
•
•
•
Active Travel & Climate Action Projects in the Donegal Municipal District
Loughrea Active Travel
Carlow Active Travel Scheme
Countywide Active Travel Project in Donegal
Newtown Road Trim – Active Travel
Sligo City Center to ATU Active Travel
Killala Town Active Travel Scheme
First Sea Road Active Travel Scheme, Sligo
St Colman’s College S.R.T.S Active Travel Scheme
Active Travel Path昀椀nder, Swords to Airport Quick Build
14
ESG Report